Sector
Healthcare
Time Taken
5 weeks
Description
This work shows the reconfiguration of a hospital Emergency Surgical Assessment Unit.
We accelerated the programme for phase one to ensure the area was ready for the Christmas period. The programme took just five weeks from start to finish.
The work involved: layout reconfiguration, partitions, ceilings, doors and internal windows (Advanced Timber Systems), lights and electrical (B.F.KEANE), acrylic bed screens, IPS basin unit (Trovex), new en-suites, medical gases (Medical Gas Pipelines), floor coverings (Anthony Forfar Carpets & Flooring), nurse station, nursecall system (Edison Telecom Ltd), drainage alterations, decoration, fire alarm (ACL).