Sector
Education
Description
This project carried out during the school summer holidays consisted of the conversion of separate male and female WCs to one large WC area with unisex cubicles.
Works included the removal of existing WCs, demolition of walls and opening up between the area and the corridor. Plumbing, electrical and ventilation alterations to suit the new layout, installation IPS duct panel sets to conceal toilet cisterns, floor to ceiling cubicles and matching wall boarding.